Engineering consultancy & contractor · Dhaka · since 2019
Engineering that is measured, designed, built and proven
From a 132 kV port substation to the earth pit behind a factory generator: our engineers audit energy, design electrical and mechanical systems, test them for safety, and install what is needed.
- Led by a SREDA Certified Energy Auditor
- Designs to BNBC 2020
- Accord / RSC safety assessments
- largest substation our team has designed
- 132 kV
- solar plant reviewed to grid handover
- 68 MW
- factories assessed for green financing
- 60+
- detailed energy audits of factories and buildings
- 30+
- grid substation designed for a sea port terminal
- 132 kV
- disciplines: energy, MEP design, safety, installation
- 4
Work delivered by our engineers since 2017, including projects carried out with partner firms.
Organisations our engineers have worked for
- Chittagong Port Authority
- Bashundhara City
- Jalal Ahmed Spinning Mills
- Noman Terry Towel Mills
- AFCCL
- AB Bank
- ULAB
- Padma Oil Company
- Sterling Apparels
- South End Sweater
- BTCL
- JK Group
- Wash Point
Services
Four disciplines, one engineering team
Most problems cross more than one discipline. An audit finds it, design fixes it on paper, installation builds it, and testing proves it. We do all four, so nothing is lost between firms.
Why Raaida
Advice you can check, and work you can test
- Measured, not assumed
- Our reports are built on readings: power-quality logs, flue-gas analysis, thermal images and earth resistance values, taken with calibrated instruments.
- Certified audit lead
- Energy audits are led by a SREDA Certified Energy Auditor and written to the formats SREDA, Bangladesh Bank and international brands accept.
- Design that can be built
- The engineers who draw our single-line diagrams also test installations on site, so drawings are sized from real loads and leave room for maintenance.
- Responsible to handover
- Every installation leaves with insulation, earth and functional test results in the handover file. If we found the problem, we can fix it and prove the fix.
Track record
Selected projects
Ports, power plants, spinning mills, shopping complexes and factory floors. Results are taken from the project documents.
MEP Design · 2022–2023
Chittagong Bay Terminal: 132/11 kV substation and port-wide electrical design
Chittagong Port Authority · Chattogram · Team experience
Complete electrical design for a new port terminal, from the 132/11 kV substation to quay lighting, with tender documents
- grid substation designed
- 132 kV
- port distribution voltage
- 11 kV
- design programme
- 9 months
Electrical safety audit and testing of a laboratory facility
Testing laboratory facility · Ashulia, Savar
74-point safety audit: 5 very-high and 21 high-risk findings, plus earthing above the 1 Ω limit
SREDA designated-consumer energy audit of a cotton spinning mill
Jalal Ahmed Spinning Mills · Narayanganj
19 measures with about 3.1-year blended payback and about 4,800 tCO₂e saved a year
Sirajganj 68 MW solar power plant: electrical design review and site quality assurance
Utility-scale solar power plant · Sirajganj
Design review, PV system approval and site inspections through to power handover to the national grid
Boiler energy efficiency assessment at an apparel factory
Sterling Apparels · Ashulia, Dhaka
Boiler running at about 73% against 80% rated, with about 4% condensate recovery
Energy audit of a large shopping and entertainment complex
Bashundhara City · Dhaka
9 measures saving about 1.47 GWh and 926 tCO₂ a year, payback about 2.7 years
Green refinance energy audit at a sweater factory
South End Sweater · Ashulia, Dhaka
32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year
How we work
From measurement to a working installation
Start at any step. Many clients begin with an audit or a safety assessment and ask us to carry the findings through.
-
01
Measure
Site survey, power-quality logging, thermal imaging, flue-gas analysis and a year of energy data.
-
02
Design
Load calculations, single-line diagrams, layouts and BoQ to BNBC 2020 and client standards.
-
03
Build
Panels, substations, generators, earthing, fire alarm and rooftop solar, installed by our team.
-
04
Verify
Testing and commissioning records, and measured savings where energy was the goal.
Sectors
Where we work
- 01 Textile & Apparel Garment, knit, sweater and denim factories and spinning mills: energy audits for SREDA and green finance, boiler and machinery assessments, electrical safety for Accord/RSC. Explore
- 02 Industrial Plants Process plants with captive power, steam and heavy electrical loads: chemicals, packaging, FMCG and testing facilities. Explore
- 03 Commercial Buildings Shopping complexes, offices and laboratories: HVAC and chiller performance, power quality, safety and tenant fit-out design. Explore
- 04 Institutional & Residential Mosques, campuses and private residences: electrical design, earthing and lightning protection, generators and rooftop solar. Explore
- 05 Infrastructure & Utilities Ports, power plants, economic zones and airports: high-voltage substations, distribution networks, lighting and design review for public infrastructure. Explore
- Not sure where your site fits? Describe it to an engineer and we will tell you what applies. Ask an engineer
People
Led by engineers you can name
Every project has a named lead. You speak to the person who will be on your site.
Masuma Akter
Proprietor & Chief Financial Officer
Dhaka, Bangladesh
Mareike Fischer
Adviser
Berlin, Germany
Rasel Mahmud
Adviser
Albany, New York, United States
Jubaer Ahmed Raji
Project Manager
Dhaka, Bangladesh
Md Ziaur Rahman
Site Engineer
B.Sc. (EEE)
Matrook Islam
Developer
Dhaka, Bangladesh
Md Sakil
Project Coordinator
Dhaka, Bangladesh
Our software
Rumara: measure · verify · save
We wrote our own software for the calculations we do every week. It grew into Rumara, a platform that runs an energy audit from data collection to a SREDA-format report, with anomaly checks and a second review built in.
- One workspace for factory, audit firm and reviewer
- Boiler, chiller, compressed air, motor, lighting, steam and solar PV calculations
- General, captive power and SREDA-format reports
- Two-step review, then measures are locked and tracked
Insights
Lessons from the field
What we measure on site, written up by the engineers who measured it.
Why earthing so often fails the 1 Ω limit at substations and generators
Most sites we test have system or generator earths above the BNBC 2020 limit, while lightning-protection earths usually pass. Here is why, and what fixes it.
By Rubel Mahmud
How much do efficient machines really save in garment factories?
Across six machinery assessments, new equipment used about 30–50% less energy than conventional machines, with payback of two to four years. What drives the numbers.
By Rubel Mahmud
Gas boilers running below nameplate: what we measure and the cheapest fixes
A boiler rated at 80% measured about 73%, with only about 4% of condensate returned. The first fixes are low-cost: combustion tuning and bringing the condensate back.
By Rubel Mahmud
Start a conversation
Discuss your project with an engineer
Tell us about the site and what you need. An engineer will reply within one working day.