Case study · Energy & Sustainability

Boiler energy efficiency assessment at an apparel factory

Boiler running at about 73% against 80% rated, with about 4% condensate recovery

Client
Sterling Apparels
Location
Ashulia, Dhaka
Year
2025
Delivery
Delivered by Raaida Engineering
Thermal image, uninsulated steam valve (133 C)
measured boiler efficiency
≈73%
rated efficiency
80%
condensate recovered
≈4%
boiler capacity
313 kg/h

The challenge

As part of a decarbonisation programme, the factory suspected that its 313 kg/hr gas-fired boiler was running below its rated performance, but had no measurements to confirm it or to size the fix.

Our approach

In May 2025 our team ran a one-hour loading test on the boiler and analysed the flue gas to calculate efficiency by the indirect method. We imaged the steam distribution lines with a FLIR thermal camera to find uninsulated sections and leaks, and surveyed how much condensate was returned to the boiler house. The work followed SREDA guidelines for boiler assessment.

The result

Boiler efficiency measured about 73% against 80% rated, with combustion efficiency of about 74%. Only about 4% of condensate was being recovered. The recommended measures, covering combustion tuning, insulation and condensate return, would bring the plant back to about 80%.

Why it matters

Every point of boiler efficiency lost is gas burned for nothing, every hour the boiler runs. Condensate that goes to drain takes its heat with it, and the fresh water that replaces it has to be treated and heated again from cold. On a boiler that runs all year, small losses add up to a large share of the gas bill.

  • Tune combustion to bring excess air back to the right level, the lowest-cost measure
  • Insulate the valves, flanges and fittings that the thermal images showed radiating heat
  • Return condensate to the feed tank to recover its heat and its treated water

Together, these measures would bring the plant back to about 80% efficiency.

Is your boiler meeting its rating?

A loading test and flue-gas analysis give the answer in a day on site.

On site

Thermal image, boiler shell, hot inspection port (129 C)
Thermal image, uninsulated flanges on steam line (120 C)
Thermal image, boiler front, burner area (142 C)
Thermal image, boiler steam outlet valve (114 C)
Thermal image, header valves, uninsulated valve bodies
Thermal image, overhead steam distribution lines (56 C)

What we learned