Skip to content
Raaida Engineering

Inspection backed by instrument tests, ranked by risk

Electrical & Fire Safety

Electrical safety assessments, thermographic surveys, and earth and insulation-resistance testing to BNBC 2020, NFPA 70 and Accord/RSC, with every finding photographed and ranked by risk.

Earth resistance test, Hioki FT6380 clamp-on tester on earth conductor
Earth resistance test with a clamp-on tester during an electrical safety audit, Ashulia, 2024
Who it is for
Factories preparing for buyer or Accord/RSC audits, laboratories, offices and any site without recent test records.
Lead engineer
Rubel Mahmud M.Sc. EEE (BUET) · SREDA Certified Energy Auditor
Standards
BNBC 2020 Part VIIINFPA 70IEC 60364BS 7671Accord / RSC
You receive
  • Checkpoint register rated Very High to Low
  • Thermographic survey report
  • Earth and insulation test sheets
  • Photo evidence of each finding
  • Corrective action plan

Scope

What we do

  1. 01

    Electrical safety assessment

    Substation, generators, ATS, boards, cabling and protection, checkpoint by checkpoint.

  2. 02

    Thermographic survey

    Panels, busbars and terminations, classified by temperature rise.

  3. 03

    Earth resistance testing

    System, generator and lightning-protection earths against the 1 Ω and 10 Ω BNBC limits.

  4. 04

    Insulation-resistance testing

    Cables tested at 500 V and 1000 V.

  5. 05

    Power quality

    Logging where overheating or nuisance tripping points to harmonics or imbalance.

  6. 06

    Fire safety and HIRA

    Fire audits and hazard identification for workplaces.

Findings your maintenance team can act on

A safety assessment is only useful if the findings are specific. Each of ours names the board, the breaker or the earth pit, says how serious the problem is, and says what to do about it. Our engineers go through the installation checkpoint by checkpoint and photograph every non-conformity.

The visual inspection is backed by instrument tests, because the most dangerous faults are the ones you cannot see: a termination running hot, an earth that no longer meets the limit, insulation that has started to break down.

From a recent assessment

checkpoints inspected at a testing laboratory in Ashulia
74
very-high and high-risk findings ranked for action
26
generator earth measured against a 1 Ω limit
3.4 Ω
thermal hot spots found in panels and terminations
7

What a first assessment usually finds

In first-time assessments, a large share of checkpoints is typically non-compliant. The same gaps appear again and again:

  • No up-to-date single-line diagram, so nobody is sure how the installation is protected
  • Earth pits above the 1 Ω limit at the substation or generator
  • No residual-current protection in wet areas
  • Loose or overheated terminations that only thermography reveals
  • Breakers larger than the cables they are meant to protect
  • Unmanaged cable bundles in trenches and risers
  • No record of maintenance or periodic testing

How an assessment runs

  1. Step 1

    Documents

    Single-line diagram, earlier reports and any test records. If there is no diagram, that becomes the first finding.

  2. Step 2

    Inspection

    Substation, generators, changeover, boards, cabling and housekeeping, against a checkpoint register based on BNBC 2020 and NFPA 70.

  3. Step 3

    Instrument tests

    Thermography under normal load, clamp-on earth resistance tests with the system running, and insulation tests on isolated circuits.

  4. Step 4

    Report and close-out

    Findings ranked Very High to Low with photos and corrective actions. After corrections we retest, so the plan closes with evidence.

Accord, RSC and BNBC

Our engineers have carried out electrical safety assessments, fire safety audits with evacuation plans, and structural integrity assessments for garment factories working towards Accord and RSC compliance, as well as periodic earthing tests for institutional buildings against BNBC 2020.

Instruments

FLIR TG297 thermal camera, Hioki FT6380 clamp-on earth tester, PROVA 6830A and Hioki PW3360-20 power-quality analysers, and insulation-resistance testers.

Track record

Projects: Electrical & Fire Safety

All related projects
Electrician in a hard hat working at an electrical panel
Electrical & Fire Safety

Electrical safety assessment programme for garment factories

Multiple RMG factories

Detailed assessments to BNBC and Accord/RSC standards, identifying electrical hazards and the corrective actions for each

Fire pump and pipework in a plant room
Electrical & Fire Safety

Fire safety audits and evacuation plans for garment factories

Multiple RMG factories

Fire safety audits, emergency evacuation plans and system upgrade recommendations for Accord/RSC compliance

Corner of a multi-storey concrete building
Electrical & Fire Safety

Structural integrity assessments of factory buildings

Multiple RMG factories

Detailed structural assessments with retrofitting recommendations for Accord/RSC compliance

Row of fire extinguishers mounted on a wall
Supply & Installation

Fire detection and alarm system for a residential complex

Apartment complex · Mirpur, Dhaka

Multi-zone fire detection and alarm system installed and commissioned across a large apartment complex

FAQ

Questions clients ask

All questions
What is an electrical safety assessment (ESA)?
A structured inspection of an electrical installation against a checkpoint register, backed by instrument tests such as thermography, earth resistance and insulation resistance. Each non-conformity is photographed, rated by risk and given a corrective action.
What earth resistance values should we expect?
BNBC 2020 sets 1 Ω as the limit for system and equipment earthing, and 10 Ω for lightning-protection earthing. Readings above the limit usually call for additional or deeper electrodes, soil treatment or bentonite.
Do we need to shut down for the assessment?
Most of the inspection, thermography and clamp-on earth testing is done with the system running, which is when hot spots show up. Insulation-resistance testing needs the circuit isolated, so we plan those tests with your maintenance team.
Can you fix the findings?
Yes. Our design team prepares corrected drawings where needed, and our installation team carries out the work and retests, so the corrective action plan is closed out with test results.

Related insights

Guides & tools

One team

Works well with

Detail of an electrical conduit layout drawing for a private residence

MEP Design

Electrical, HVAC, plumbing and fire design to BNBC 2020.

Start a conversation

Discuss your project with an engineer

Tell us about the site and what you need. An engineer will reply within one working day.