An electrical safety assessment (ESA) checks an installation against a register of checkpoints and backs the inspection with instrument tests. A little preparation means the assessors spend their time finding problems, not finding keys.
Documents to have ready
- An up-to-date single-line diagram. If there is none, tell us: it will be a finding, not a problem
- Previous ESA reports and corrective action plans
- Earth-pit locations and any past test results
- Maintenance records for panels, transformers and generators
Access and timing
Assessors need access to the substation, generator room, main and sub-distribution boards, and risers. Thermography is done with the system under normal load, so plan the visit for a working day. Insulation-resistance tests need circuits isolated, so agree a window with production in advance.
What happens on the day
-
Step 1
Opening meeting
We confirm the scope, the areas to be covered and the safety rules of your site.
-
Step 2
Inspection
Checkpoint by checkpoint, with a photograph of every non-conformity.
-
Step 3
Tests
Thermography and clamp-on earth tests with the system live, then insulation tests on isolated circuits.
-
Step 4
Closing meeting
We tell you on the day about anything that needs urgent attention. The full report follows.
Acting on the findings
Fix Very High and High risk items first. Many findings, such as loose terminations, missing covers and unlabelled circuits, are quick and cheap. Earthing and lightning protection usually need planned works. Retest after corrections so the action plan is closed with evidence.