Why our numbers hold up
Most energy reports we are asked to review are built from nameplates and electricity bills. Ours start on the factory floor. Before we recommend anything, our engineers log power and harmonics at the main boards, run boilers and gensets under load with a flue-gas analyser in the stack, scan panels and steam lines with a thermal camera, and line up at least a year of energy and production data.
That evidence does two jobs. It tells you which measures are worth paying for and which are not. And it gives a lender, a brand or SREDA figures they can check, which is what gets a report accepted the first time.
Results from recent assessments
- energy saving verified on new machinery at a garment factory in Gazipur
- ≈51%
- financed items found eligible in a green-refinance audit
- 32 of 51
- boiler efficiency measured against 80% rated
- ≈73%
- savings measures identified at a 141 GWh spinning mill
- 19
What a typical audit finds
- Boilers below their rating. A 313 kg/hr gas boiler rated at 80% measured about 73%, with only about 4% of condensate returned.
- Captive power without heat recovery. Gas gensets running at about 37–40% electrical efficiency. With exhaust and jacket-water heat recovered, plants we assessed reached 70–80% overall fuel use.
- Chillers under design. In a large commercial complex, chillers ran at a COP of 4.5–4.7 against 5.6 design.
- Harmonics above the limit. Current distortion of 35–45% against the 15% IEEE 519 limit, enough to overheat neutrals and transformers.
- No sub-metering. Without it, nobody can show where energy goes or prove that a measure worked.
How an assessment runs
-
Step 1
Data request
Twelve months of bills and production, the single-line diagram and an equipment list. If something is missing we note it and fill what we can on site.
-
Step 2
Site measurement
Power and harmonic logging, flue-gas analysis, thermal imaging, flow, temperature and lighting readings, taken by our audit team.
-
Step 3
Analysis
A baseline using regression and CUSUM, specific energy consumption by product, and an engineering calculation for each measure.
-
Step 4
Report and walkthrough
Measures ranked by saving, payback, NPV and IRR. We walk your team through the findings before the report is final.
Audits for regulators, lenders and brands
Different readers need different reports, and we have written for all of them. For SREDA, we prepare designated-consumer audits under the Energy Audit Regulation 2023 in the Form-8 format. For Bangladesh Bank green-financing schemes, our engineers have assessed more than 60 factories, checking each financed item for eligibility and savings. For gas utilities and the energy regulator, we have audited captive power and steam plants for KGDCL and BERC compliance.
For international brands, our engineers have carried out more than 25 Level II detailed audits of garment and textile factories and led the Bangladesh side of two European supply-chain decarbonisation programmes.
Instruments we bring
Power and harmonics analysers (PROVA 6830A, Hioki PW3360-20), a Testo 320 flue-gas analyser, FLIR thermal cameras, an ultrasonic flow meter, clamp meters, a lux meter and a thermo-anemometer.
After the audit
A report is only useful if something changes. Our design team can specify the measures, our installation team can carry them out, and we can measure again to verify the saving.