Energy audit of a large shopping and entertainment complex

9 measures saving about 1.47 GWh and 926 tCO₂ a year, payback about 2.7 years

Client
Bashundhara City
Location
Dhaka
Year
2025–2026
Delivery
Delivered with Armabel Global Limited
Centrifugal chiller compressor and motor housing
saved per year
≈1.47 GWh
CO₂ avoided per year
≈926 t
payback
≈2.7 yrs
chiller COP vs design
4.5 vs 5.6

The challenge

The complex uses about 31 GWh of electricity a year, almost all from the grid. Its energy use intensity of about 199 kWh/m² a year was above the 160–180 benchmark for the building type, and HVAC accounted for about 55% of consumption.

Our approach

As a SREDA designated-consumer audit led by a certified auditor, we built a 2024 baseline using regression and CUSUM analysis. Field work included a heat-balance test of chiller COP, a CO₂ and airflow survey for ventilation, power-quality logging against IEEE 519 with a PROVA 6830A analyser, and a thermographic survey. A review visit followed in December 2025.

The result

Nine measures were identified, saving about 1.47 GWh a year (about 4.7%) and about 926 tonnes of CO₂, with a payback of about 2.7 years. Chillers were running at a COP of about 4.5–4.7 against 5.6 design, and current harmonic distortion reached about 45% against a 15% limit.

Why it matters

When cooling is more than half the load, chiller performance decides the electricity bill. A chiller running at a COP of 4.5 instead of 5.6 uses roughly a quarter more electricity for the same cooling. And current harmonics at three times the recommended limit heat neutrals and transformers, shortening their life and adding losses of their own.

Where the savings are

The nine measures address chiller plant performance, ventilation matched to occupancy using CO₂ levels, and power quality. Some, such as ventilation control and scheduling, pay back much faster than the 2.7-year average, because they change how existing equipment is run instead of replacing it.

Managing a large building?

An audit of the chiller plant and main boards covers most of the load.

On site

PROVA 6830A power and harmonics analyser, harmonic table on screen
PROVA 6830A showing a distorted current waveform
Distribution board with PROVA 6830A leads connected for power-quality logging
Water-cooled chiller heat-exchanger head ("Chiller 05")
Chilled/condenser water pump and motor with insulated piping
Thermal image, chiller shell surface, cold spot 19.4 C
Thermal image, luminaire hot spot 53.8 C