Skip to content
Raaida Engineering

Sector

Commercial Buildings

Shopping complexes, offices and laboratories: HVAC and chiller performance, power quality, safety and tenant fit-out design.

Where commercial buildings lose energy

In a commercial building, cooling usually dominates. In one large shopping and entertainment complex we audited, HVAC was about 55% of a load of roughly 31 GWh a year. The cheapest savings tend to come from ventilation that runs harder than occupancy needs, equipment left on after hours, and chillers running well below their design performance.

  • Energy audits, including SREDA designated-consumer audits
  • Chiller COP heat-balance tests and cooling-tower checks
  • CO₂ and airflow surveys for demand-controlled ventilation
  • Power-quality logging against IEEE 519
  • Electrical safety assessments for tenancies and laboratories
  • MEP design for new buildings, fit-outs and extensions
  • Building wiring, panels and fire detection, installed and tested

Our record in the sector

Our engineers have audited one of Dhaka's largest shopping complexes, designed the MEP systems for a bank building in Gulshan and a commercial building in Paribagh, prepared electrical layouts for a multi-storey building in Baridhara, and wired a new multi-storey office building from end to end.

What we typically find

Harmonics are a recurring finding: current distortion of 35–45% against a 15% limit in two buildings we assessed, enough to overheat neutrals and transformers. Chillers commonly run 15–20% below their design COP. And ventilation is rarely matched to how many people are actually in the building.

Where to start

Building owners usually come to us with a rising electricity bill, a regulatory audit or a planned fit-out. An audit of the chiller plant and the main distribution boards covers most of the load in most buildings, and it can be done without disturbing tenants.

Projects in commercial buildings

All sector projects
MEP Design 2026

Electrical layouts and SLD for a multi-storey building

Multi-storey building · Baridhara, Dhaka

Electrical layouts from third basement to roof, single-line and circuit diagrams

High-rise commercial building against a blue sky
MEP Design 2020

MEP design for a bank building, Gulshan

AB Bank Limited · Dhaka

HVAC, power distribution, lighting and fire systems designed for a banking facility that cannot afford downtime

Glass-fronted commercial office towers
MEP Design 2017–2018

MEP design and supervision for a commercial building, Paribagh

Padma Oil Company Limited · Dhaka

Complete electrical, mechanical, plumbing and fire system design, followed by construction supervision

Team experience
Interior corridor of a commercial building
Supply & Installation

Complete building wiring for a commercial office building

Multi-storey commercial office · Dhaka

End-to-end wiring and electrical system installation for a new multi-storey office building

Start a conversation

Discuss your project with an engineer

Tell us about the site and what you need. An engineer will reply within one working day.