Installed, tested and handed over with records

Supply & Installation

Supply, installation and commissioning of panels and switchgear, substations, generators, earthing, fire alarm and rooftop solar, tested before handover.

LT panel, incomer and outgoing MCCBs with cable terminations
LT panel incomer and outgoing MCCBs, inspected during an electrical safety audit
Who it is for
Factories and buildings acting on an audit or safety report, and owners or consultants who need a contractor that tests its own work.
Lead engineer
Md Ziaur Rahman B.Sc. (EEE)
Standards
BNBC 2020IEC 61439IEC 60364Electricity Rules 1937
You receive
  • Equipment to approved datasheets
  • Installation and termination
  • Insulation, earth and functional test results
  • As-built drawings and handover file

Scope

What we do

  1. 01

    Panels and switchgear

    LT panels, MCCB and MCB boards, ATS.

  2. 02

    Substations

    Transformer, HT and LT connections, metering.

  3. 03

    Standby generators

    Supply, installation, changeover and commissioning.

  4. 04

    Wiring and conduits

    New buildings and retrofits.

  5. 05

    Earthing and lightning protection

    New pits, soil treatment and bonding to meet BNBC limits.

  6. 06

    Fire alarm and rooftop solar

    Detection and alarm systems; grid-tied PV.

Installation by engineers who test

We install what our own audit team would want to find on a site: neat terminations, labelled circuits, earthing within the limit and a file of test results. Our installation work grew out of our safety assessments. Clients who had seen our findings asked us to put them right.

We work from our own designs or from a consultant's drawings and BoQ, and we raise site conflicts before we install, not after.

Work we have delivered

  • Turnkey substation installation for a telecom facility in Mirpur: supply and installation of substation and generator switchgear.
  • Distribution system upgrade for a manufacturing group: new distribution boards and panels for the main factory.
  • Standby generator: supply, installation and commissioning of a 60 kVA set with battery extension for a government facility.
  • Fire detection and alarm: a multi-zone system installed and commissioned across a large apartment complex in Mirpur.
  • Complete building wiring for a new multi-storey commercial office building.

How an installation runs

  1. Step 1

    Survey and scope

    A site visit to confirm cable routes, space and access, and to check the drawings against what is actually there.

  2. Step 2

    Supply

    Equipment to the agreed specification, with datasheets submitted for approval before anything is ordered.

  3. Step 3

    Install

    Work planned around your operations, with shutdowns agreed in advance and kept as short as possible.

  4. Step 4

    Test and hand over

    Insulation, earth and functional tests, as-built drawings and a handover file your maintenance team can use.

What "tested before handover" means

  • Insulation-resistance test on every new cable
  • Earth-resistance test on every new electrode, against the BNBC 2020 limit
  • Functional test of protection and changeover
  • As-built drawings that match what was installed

Often the last step of a bigger job

Many installations follow an electrical safety assessment or an energy audit. The report identifies what to change, our design team specifies it, and we install and verify it. One team, one set of records.

Track record

Projects: Supply & Installation

All related projects
Transformers and busbars in an electrical substation
Supply & Installation

Turnkey substation equipment installation for a telecom facility

BTCL, Mirpur · Mirpur, Dhaka

Supply and turnkey installation of substation and generator switchgear

Supply & Installation

Electrical distribution system upgrade for a factory

JK Group

New distribution boards and panels supplied and installed to upgrade the main factory power system

Row of fire extinguishers mounted on a wall
Supply & Installation

Fire detection and alarm system for a residential complex

Apartment complex · Mirpur, Dhaka

Multi-zone fire detection and alarm system installed and commissioned across a large apartment complex

Interior corridor of a commercial building
Supply & Installation

Complete building wiring for a commercial office building

Multi-storey commercial office · Dhaka

End-to-end wiring and electrical system installation for a new multi-storey office building

FAQ

Questions clients ask

All questions
What do you supply and install?
Distribution boards and LT panels, switchgear and ATS, substations, standby generators, wiring and conduiting, earthing and lightning protection, fire detection and alarm, and grid-tied rooftop solar.
Is the installation tested before handover?
Always. We carry out insulation-resistance tests on new cables, earth-resistance tests on new electrodes and functional tests of protection and changeover, and include the results in the handover file with as-built drawings.
Can you install to another consultant's design?
Yes. We work from a consultant's drawings and BoQ, and raise any site conflicts or design questions before we install.

One team

Works well with

Detail of an electrical conduit layout drawing for a private residence

MEP Design

Electrical, HVAC, plumbing and fire design to BNBC 2020.

Start a conversation

Discuss your project with an engineer

Tell us about the site and what you need. An engineer will reply within one working day.