Why earthing so often fails the 1 Ω limit at substations and generators
Most sites we test have system or generator earths above the BNBC 2020 limit, while lightning-protection earths usually pass. Here is why, and what fixes it.
By Rubel Mahmud
Engineering consultancy & contractor · Mirpur, Dhaka · since 2019
From the field
What we see on site, written up by the engineers who measured it. Figures are rounded and client details are left out.
Most sites we test have system or generator earths above the BNBC 2020 limit, while lightning-protection earths usually pass. Here is why, and what fixes it.
By Rubel Mahmud
Across six machinery assessments, new equipment used about 30–50% less energy than conventional machines, with payback of two to four years. What drives the numbers.
By Rubel Mahmud
A boiler rated at 80% measured about 73%, with only about 4% of condensate returned. The first fixes are low-cost: combustion tuning and bringing the condensate back.
By Rubel Mahmud