Earth resistance is one of the first things we test on any electrical safety assessment, and one of the most common failures. Across the sites our team has tested, system and generator earths were above the 1 Ω limit more often than not, with readings up to about 3.4 Ω. Lightning-protection earths, with their looser 10 Ω limit, usually passed.
What the limits are
BNBC 2020 sets 1 Ω for system and equipment earthing, the path that carries fault current back to the source so protection operates quickly. Lightning-protection earthing has a 10 Ω limit because its job is different: dissipating a short, high-energy surge into the ground.
Why readings drift above the limit
- Dry or sandy soil: resistivity varies a lot across sites and seasons, and an electrode that met the limit in the monsoon may not in the dry season.
- Too few or too short electrodes: a single shallow rod rarely achieves 1 Ω on its own.
- Corroded or loose connections between the conductor and the electrode, often hidden in a pit that has not been opened for years.
- No records: without past readings, nobody notices the slow rise until a test is done.
How we test
On running sites we use a clamp-on earth tester (Hioki FT6380), which measures each earth path without disconnecting it. Where the layout allows, we confirm critical readings with a conventional fall-of-potential test. Every pit gets a reading, a photo and a location on the drawing, so the next test can be compared.
What fixes it
-
Step 1
Add electrodes
Additional rods in parallel, spaced apart so their zones of influence do not overlap.
-
Step 2
Go deeper
Longer or deeper electrodes reach moister, lower-resistivity soil.
-
Step 3
Treat the soil
Bentonite or other earth-enhancing compounds around the electrode lower contact resistance.
-
Step 4
Retest and record
Measure again after the work and keep the results, so future drift is visible.
How often should earthing be tested?
Test earthing at least once a year, and after any change to the installation or any fault. Test in the dry season if you can, because that is when resistance is highest. Keep the readings: a pit that rises from 0.6 Ω to 0.9 Ω over two years is telling you something before it fails.
A short checklist for maintenance teams
- Is every earth pit numbered, accessible and marked on a drawing?
- Is there a dated reading for each pit from the last twelve months?
- Are the generator and transformer neutrals earthed separately from equipment earths where the design requires it?
- Are connections in the pits tight and free of corrosion?
If your site has not had its earthing tested recently, an electrical safety assessment covers it, and our installation team can carry out the remedial works.
Based on these projects
CEO & Team Leader · M.Sc. EEE (BUET) · SREDA Certified Energy Auditor
Electrical engineer who leads Raaida's audit, safety and design work, and the technical lead behind the Rumara audit platform.