Case study · Energy & Sustainability

Green refinance energy audit at a sweater factory

32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year

Client
South End Sweater
Location
Ashulia, Dhaka
Year
2026
Delivery
Delivered by Raaida Engineering
Row of energy-efficient tumble dryers
line items eligible
32 / 51
saved per year
≈237 TOE
CO₂ avoided per year
≈628 t
payback
≈2.1 yrs

The challenge

To refinance efficient equipment bought under 18 letters of credit, the factory needed the energy audit report required by Bangladesh Bank's green refinance scheme, item by item.

Our approach

After a site visit in May 2026, a SREDA Certified Energy Auditor reviewed all 51 LC line items against the scheme criteria. We built a baseline from eleven months of energy and production data using specific energy consumption, regression and CUSUM analysis, and assessed the site's energy management against a maturity matrix.

The result

32 of the 51 items qualified. Together they save about 237 TOE and about 628 tonnes of CO₂ a year, with a payback of about 2.1 years. The finding that only part of the equipment qualifies is common in these audits, and it is why each item has to be checked rather than the whole purchase assumed eligible.

Why item-by-item checking matters

A refinancing application covers everything bought under the letters of credit, but only equipment that meets the scheme criteria counts. Here 32 of 51 items qualified. Assuming the whole purchase is eligible is the most common reason applications are sent back. Checking each item first avoids that.

What the report contained

  • An eligibility assessment for each of the 51 line items
  • A baseline from eleven months of energy and production data
  • Energy and CO₂ savings and payback for the eligible equipment
  • A review of the site's energy management against a maturity matrix

Applying for green refinancing?

We prepare the energy audit report the scheme requires.

On site

Energy-efficient front-loading washing machine
Centrifugal hydro-extractor
Busbar trunking feeding LT panel in substation room
Ceiling indoor unit with insulated refrigerant piping (VRF)
Energy-efficient tumble dryer nameplate

What we learned