Skip to content
Raaida Engineering

Sector

Textile & Apparel

Garment, knit, sweater and denim factories and spinning mills: energy audits for SREDA and green finance, boiler and machinery assessments, electrical safety for Accord/RSC.

What textile and apparel sites ask us for

Most of our factory work is in textiles and apparel, from sewing floors in Gazipur and Ashulia to spinning mills that run their own gas-engine power plants. A request usually starts with one of three things: a SREDA designated-consumer audit, a Bangladesh Bank green-financing application for new machinery, or a buyer's target for energy, carbon or safety.

  • Verification of savings from efficient sewing, knitting, washing and finishing machines
  • Green-refinance audits that check every financed item for eligibility
  • Boiler, steam and condensate assessments
  • Captive power plant efficiency and heat recovery for spinning and composite mills
  • Electrical safety assessments, thermography and earthing tests to Accord and RSC expectations
  • Electrical and MEP design for new factories and extensions

Our record in the sector

factories assessed for green financing
60+
Level II detailed energy audits of garment and textile factories
25+
spinning mill audited as a SREDA designated consumer
141 GWh

Our engineers have also designed the electrical system of a LEED Platinum certified garment factory, led the Bangladesh side of two European supply-chain decarbonisation programmes, and carried out electrical, fire and structural safety assessments for factories working towards Accord and RSC compliance.

What we typically find

Efficient machinery usually cuts energy use by 30–50% compared with conventional equipment, with payback of two to four years. Boilers often run several points below their rated efficiency with very little condensate returned. Captive gensets lose more than half their fuel as heat unless it is recovered. And few sites have the sub-metering needed to prove a saving afterwards.

Where to start

If a lender, a buyer or SREDA has asked you for a report, send us the request and the deadline. We will tell you what data we need, how long the site work takes and what the report will contain. If nobody has asked yet, a boiler or compressed-air assessment is usually the fastest way to find savings that pay for themselves.

Projects in textile & apparel

All sector projects
Computerised flat-knitting machine, side view (machine-maker badge only)
Energy & Sustainability 2024

Efficient machinery assessment at a sweater factory

Sweater factory · Ashulia, Dhaka

About 51% saving from new machines (about 62 TOE a year), payback about 3.3 years

Large industrial factory building
Energy & Sustainability 2024

Detailed energy audit of a composite textile plant

South East Textiles (Pvt.)

Dyeing, finishing and utility systems audited, with specific energy consumption benchmarked and an investment roadmap

Energy & Sustainability 2024

Efficient machinery assessment at a knit composite factory

Knit composite factory · Gazipur

About 28% saving, about 1,530 TOE and 4,170 tCO₂ a year, payback about 3.9 years

Team experience
Spools of thread in a textile mill
Energy & Sustainability 2024

Detailed energy audit of a terry towel mill

Noman Terry Towel Mills

Whole-site audit of a vertically integrated mill: dyeing, drying and finishing heat, plus a full electrical baseline

Team experience

Start a conversation

Discuss your project with an engineer

Tell us about the site and what you need. An engineer will reply within one working day.