Case study · Energy & Sustainability

Energy efficiency assessment of a new biological ETP

About 45% lower energy than a conventional ETP: about 236 MWh and 158 tCO₂ a year

Client
Wash Point Ltd
Location
Gazipur
Year
2025–2026
Delivery
Delivered with Armabel Global Limited
Aeration tank surface showing fine-bubble diffuser pattern
less energy than conventional
≈45%
saved per year
≈236 MWh
CO₂ avoided per year
≈158 t

The challenge

A denim washing plant had built a new 40 m³/hr activated-sludge effluent treatment plant and needed its energy savings verified against a conventional design.

Our approach

In December 2025 we measured the drives with a clamp meter and compared the installed system, with VFD-controlled roots blowers on dissolved-oxygen control, fine-bubble diffusers and IE3 motors, against a conventional baseline. NPV and IRR were calculated for the investment.

The result

The new ETP uses about 45% less energy than a conventional design, saving about 236 MWh (about 58 TOE) and about 158 tonnes of CO₂ a year.

Why it matters

In a biological effluent treatment plant, the blowers that aerate the tanks are the largest energy user. A conventional plant runs them at a fixed speed whatever the load. Controlling variable-speed blowers by the dissolved-oxygen level supplies only the air the process needs, and fine-bubble diffusers transfer more of that oxygen into the water.

What was verified

Our engineers measured the installed drives and compared the system with a conventional baseline of the same capacity, then calculated NPV and IRR for the investment. The result gave the plant a defensible figure for its financing and sustainability reporting.

On site

Roots blower with motor and belt drive in enclosure
Row of acoustic enclosures for ETP air blowers
ETP motor control centre panel with HMI and selector switches
Electromagnetic flow meter display, close-up
Clarifier / settling tank

What we learned