- grid substation designed
- 132 kV
- port distribution voltage
- 11 kV
- design programme
- 9 months
The challenge
A new deep-water terminal needs power on a different scale from a building. Ship-to-shore cranes, yard equipment, reefer stacks and high-mast lighting all draw from one network, and a failure anywhere stops cargo. The Bay Terminal needed its whole electrical system designed from the grid connection down, in a form the port authority could tender.
Our approach
Our engineers prepared the full electrical design for the terminal:
- a 132 kV / 11 kV grid substation as the terminal's point of supply
- the 11 kV and low-voltage distribution network across the port
- power supply for cargo-handling equipment
- port and yard lighting
- earthing and lightning protection for structures and equipment
The result
The design was issued with a cost estimate and a full set of tender documents, giving the port authority a package that contractors could price like for like. The work ran from November 2022 to July 2023 and remains the largest substation our team has designed.
Why it matters
At a port, electrical design is operational design. The substation capacity limits how many cranes can work at once, the distribution layout decides what a single fault takes out, and lighting levels determine whether the yard can work safely at night. Getting these right on paper is far cheaper than correcting them in concrete.
What the client received
- Design of the 132/11 kV grid substation
- Distribution design for cargo-handling equipment and port buildings
- Port and yard lighting design
- Earthing and lightning-protection design
- A cost estimate and complete tender documents