- certification achieved by the factory
- LEED Platinum
- design period
- 2017–18
The challenge
A garment factory aiming for LEED Platinum has to prove low energy use on paper before it is built, while also meeting the electrical and fire safety requirements that apply to every export-oriented factory in Bangladesh. The two sets of rules pull the design in different directions unless they are handled together from the first load schedule.
Our approach
Our engineers produced the factory's electrical system design with efficiency built in: lighting designed to low power density with daylight in mind, high-efficiency motors, and a distribution system sized from calculated loads. Protection, earthing and cable routing were designed to the safety standard used for Accord inspections.
The result
The factory was certified LEED Platinum. For our team it set the pattern we still follow: energy efficiency and electrical safety are designed together, not added afterwards.
Why it matters
Green-building certification and safety compliance are usually handled by different consultants at different times, and the electrical design gets revised twice. Designing for both from the first load schedule saves time and avoids rework, and the building is cheaper to run for its whole life.