Power for places that cannot stop
Public infrastructure runs on electrical systems far larger than a building's. A port terminal needs a grid substation of its own. A solar plant must meet the grid operator's requirements before it can export a single unit. An economic zone needs a distribution network that can grow as factories arrive.
- Grid and distribution substations: 132 kV, 33 kV and 11 kV
- Port, yard and area lighting
- Earthing and lightning protection for large sites
- Design review, site quality assurance and handover coordination with the grid operator
- Cost estimates and tender documents for public procurement
Our record in the sector
- grid substation and full electrical design for a sea port terminal
- 132 kV
- solar power plant reviewed and inspected to grid handover
- 68 MW
- substation and network designed for a national economic zone
- 33/11 kV
Our engineers have also designed the electrical systems for an airport passenger terminal expansion, and are currently the lead designer in Bangladesh for the electrical and IT systems of a container terminal, working alongside an international design team.
How we work on public projects
Infrastructure work is judged on its documents. Our designs are issued with calculations, cost estimates and tender documents that a public authority can procure against, and we are used to working within larger teams: for an architect, for an international designer or directly for an employer's engineer.