Green refinance energy audit at a sweater factory
South End Sweater · Ashulia, Dhaka
32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year
Engineering consultancy & contractor · Mirpur, Dhaka · since 2019
Track record
Work our engineers have measured, designed, tested and built, from audits of spinning mills and shopping complexes to safety testing, electrical design and installation. Results are taken from the project reports.
21 projects
South End Sweater · Ashulia, Dhaka
32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year
Jalal Ahmed Spinning Mills · Narayanganj
19 measures with about 3.1-year blended payback and about 4,800 tCO₂e saved a year
Sterling Apparels · Ashulia, Dhaka
Boiler running at about 73% against 80% rated, with about 4% condensate recovery
Bashundhara City · Dhaka
9 measures saving about 1.47 GWh and 926 tCO₂ a year, payback about 2.7 years
Woven garment factory · Gazipur
About 51% less energy than conventional machines, about 100 tCO₂ a year, payback about 3 years
FMCG manufacturing plant · Chattogram
Plant energy use about 70% with cogeneration vs about 34% without; 15 measures identified
Wash Point Ltd · Gazipur
About 45% lower energy than a conventional ETP: about 236 MWh and 158 tCO₂ a year
Flexible packaging plant · Chattogram
New gravure and lamination machines use about 45% less energy, about 553 tCO₂ a year avoided
South East Textiles (Pvt.)
Dyeing, finishing and utility systems audited, with specific energy consumption benchmarked and an investment roadmap
AFCCL · Ashuganj
Process utilities, steam balance and captive power assessed at one of the country's large fertiliser plants
Deputy Commissioner's Office, Rangpur · Rangpur
Lighting, air conditioning and office equipment loads audited, with a practical upgrade plan for a public building
Noman Terry Towel Mills
Whole-site audit of a vertically integrated mill: dyeing, drying and finishing heat, plus a full electrical baseline
Projects tagged "Delivered with Armabel Global Limited" were delivered by our technical team in association with Armabel Global Limited. "Team experience" marks work our engineers carried out with other firms. Client names appear only with permission.
Start a conversation
Tell us about the site and what you need. An engineer will reply within one working day.