Case study · Energy & Sustainability

Detailed energy audit of a fertiliser complex under the SREDA and GIZ programme

Process utilities, steam balance and captive power assessed at one of the country's large fertiliser plants

Client
AFCCL
Location
Ashuganj
Year
2024
Delivery
Executed by our team members
Process plant columns and pipework
frameworks reported to: SREDA and GIZ
2
audit completed
May 2024

The challenge

Fertiliser production is among the most energy-intensive industries in Bangladesh, and almost all of that energy is natural gas. The audit was commissioned under the joint SREDA and GIZ programme to find where a plant of this size could reduce consumption without affecting output.

Our approach

Our engineers assessed the process utilities that serve the plant, built a steam balance to show where steam is generated, used and lost, and evaluated the performance of the captive power plant. Recommendations were written to the national energy-audit requirements so they could be reported under both the SREDA and GIZ frameworks.

The result

The audit was completed in May 2024, giving the plant a documented baseline and a list of efficiency measures aligned with national compliance targets.

Why it matters

In a plant of this size, a saving of one percent is a large quantity of gas. A steam balance shows where steam is generated, where it is used and where it is lost, and it is often the first time those figures have been set side by side. It gives management a ranked list of where to act.