Green refinance energy audit at a sweater factory
South End Sweater · Ashulia, Dhaka
32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year
Engineering consultancy & contractor · Mirpur, Dhaka · since 2019
Track record
Work our engineers have measured, designed, tested and built, from audits of spinning mills and shopping complexes to safety testing, electrical design and installation. Results are taken from the project reports.
42 projects
South End Sweater · Ashulia, Dhaka
32 of 51 financed items eligible, saving about 237 TOE and 628 tCO₂ a year
Jalal Ahmed Spinning Mills · Narayanganj
19 measures with about 3.1-year blended payback and about 4,800 tCO₂e saved a year
Mosque · Jinaighati
Load chart and drawings, with space for a 150 kVA substation, 80 kVA generator and VRF units
Multi-storey building · Baridhara, Dhaka
Electrical layouts from third basement to roof, single-line and circuit diagrams
Container terminal · Chattogram
Lead designer in Bangladesh for LV/MV power, lighting, earthing and the terminal IT backbone, working with an international design team
Sterling Apparels · Ashulia, Dhaka
Boiler running at about 73% against 80% rated, with about 4% condensate recovery
Bashundhara City · Dhaka
9 measures saving about 1.47 GWh and 926 tCO₂ a year, payback about 2.7 years
Woven garment factory · Gazipur
About 51% less energy than conventional machines, about 100 tCO₂ a year, payback about 3 years
FMCG manufacturing plant · Chattogram
Plant energy use about 70% with cogeneration vs about 34% without; 15 measures identified
Wash Point Ltd · Gazipur
About 45% lower energy than a conventional ETP: about 236 MWh and 158 tCO₂ a year
Flexible packaging plant · Chattogram
New gravure and lamination machines use about 45% less energy, about 553 tCO₂ a year avoided
Testing laboratory facility · Ashulia, Savar
74-point safety audit: 5 very-high and 21 high-risk findings, plus earthing above the 1 Ω limit
Projects tagged "Delivered with Armabel Global Limited" were delivered by our technical team in association with Armabel Global Limited. "Team experience" marks work our engineers carried out with other firms. Client names appear only with permission.