Skip to content
Raaida Engineering

Track record

Projects

Work our engineers have measured, designed, tested and built, from audits of spinning mills and shopping complexes to safety testing, electrical design and installation. Results are taken from the project reports.

Delivered by

42 projects

Large industrial factory building
Energy & Sustainability 2024

Detailed energy audit of a composite textile plant

South East Textiles (Pvt.)

Dyeing, finishing and utility systems audited, with specific energy consumption benchmarked and an investment roadmap

Energy & Sustainability 2024

Detailed energy audit of a government office complex

Deputy Commissioner's Office, Rangpur · Rangpur

Lighting, air conditioning and office equipment loads audited, with a practical upgrade plan for a public building

Team experience
Spools of thread in a textile mill
Energy & Sustainability 2024

Detailed energy audit of a terry towel mill

Noman Terry Towel Mills

Whole-site audit of a vertically integrated mill: dyeing, drying and finishing heat, plus a full electrical baseline

Team experience
Energy & Sustainability 2024

Efficient machinery assessment at a knit composite factory

Knit composite factory · Gazipur

About 28% saving, about 1,530 TOE and 4,170 tCO₂ a year, payback about 3.9 years

Team experience
Computerised flat-knitting machine, side view (machine-maker badge only)
Energy & Sustainability 2024

Efficient machinery assessment at a sweater factory

Sweater factory · Ashulia, Dhaka

About 51% saving from new machines (about 62 TOE a year), payback about 3.3 years

Detail of the first-floor electrical conduit layout for a private residence in Sylhet
MEP Design 2023–2024

Electrical design, SLD and BOQ for a private residence, delivered as subcontractor to an MEP consultant

Private residence · Sylhet

Full electrical package: load chart, layouts, 150 kVA substation and generator SLD, four-part BoQ

Rolls of printed fabric
Energy & Sustainability 2021–2022

Green supplier capacity programme for an apparel supply chain

Textile and apparel suppliers

Twelve-month programme: led factory energy and emission assessments and trained supplier teams to implement the measures

Team experience
Rolls of fabric stacked in a textile store
Energy & Sustainability 2020–2024

Level II detailed energy audits of 25+ garment and textile factories

Knit, sweater, woven and denim factories

Whole-facility audits covering captive power, steam generation and all electrical and thermal equipment, for European brand programmes

Team experience

Projects tagged "Delivered with Armabel Global Limited" were delivered by our technical team in association with Armabel Global Limited. "Team experience" marks work our engineers carried out with other firms. Client names appear only with permission.

Start a conversation

Discuss your project with an engineer

Tell us about the site and what you need. An engineer will reply within one working day.